ENGINEERING SERVICES
UTILITIES
MANAGEMENT POLICY MANUAL
TABLE OF
CONTENTS
I.        UTILITIES
MANAGEMENT
C-001           Utilities
Management Program
C-002           Surgery
Suite Communications for Utility Interruptions
C-004           Utility
System Shutdown Notification
C-005           Medical
Compressed Gas Systems
C-008           Essential
Equipment Management Program
C-009           Building
Maintenance Program
Attachments
                                        Wall and Door Maintenance Check List
C-011           Airborne
Particles/Contaminant Control
                                        Attachments
C-013           Monitoring of Temperature, Relative Humidity and Pressure in Critical Environment Rooms 
                                        Attachments
C-014           Utilities Alternate Equipment Management Program 
C-015           Preventative Maintenance Policy
II.       ELECTRICAL
SYSTEMS
C-101           Power
Outage Procedure -- After 
Attachments
Power Outage After Normal Hours of Operation Call List
C-102           Power Outage
Procedure -- Normal Hours of Operation
Attachments
Power Outage -- Normal Hours of Operation Call List
C-103           Emergency
Electrical System Failure
Attachments
Emergency Electrical System Failure Call List
C-104           Failure
of Power Supply
Attachments
Power Supply Failure Call List
C-105           
C-106           General
Hospital Diesel Emergency Generator Testing Program
C-107           South
Wing Diesel Emergency Generator Testing Program
C-108           Carver
Pavilion Diesel Emergency Generator Testing Program
C-109           East Colloton
Pavilion Diesel Emergency Generator Testing Program
C-110           West
Colloton Pavilion Diesel Emergency Generator Testing Program
C-111           Pappajohn Diesel Emergency Generator Testing Program
C-112           Emergency
Trauma Center Diesel Emergency Generator Testing Program
C-113 Pomerantz Diesel Emergency Generator #1 Testing Program
C-114           Center For
Disabilities and Development Diesel Emergency Generator Testing Program
C-115 Pomerantz Diesel Emergency Generator #2 Testing Program
C-116 Pomerantz Diesel Emergency Generator #3 Testing Program
C-117 Iowa River Landing Diesel Emergency Generator Testing Program
C-118 Emergency Power Generator Facility Testing Program
Attachments           Emergency Generator Test Criterion
Plans                      Electrical
Distribution System Floor Plans
III.       Mechanical
Systems
Attachments
U of I Hospitals and Clinics Medical Air Pumps and Locations
U of I Hospitals and Clinics Vacuum Pumps and Locations
C-202 Failure of Pneumatic Tube System Emergency Procedures
Attachments
                                                  UIHC Emergency Call List for Pneumatic Tube
System
C-203 Vertical and Horizontal Transport (Elevators) Elevator Failure and Passenger Evacuation
Attachments
U of I Hospitals and Clinics Elevator Database
Elevator Designations, Main Disconnects and Locations
                                                  Safety and Security Elevator
& Escalator Procedures (Emergency & Trouble)
C-204           Lockout
and Tagout Procedure General Information
C-205 Boiler and Steam Distribution Systems Emergency Procedures
Attachments
C-206 Plumbing and Water Distribution Systems Emergency Procedures
Attachments
U of I Hospitals and Clinics Water Distribution
Attachments
Hospital Emergency Call List for Bulk Medical Gas Systems
C-208           Bulk
Medical Gas Storage Facility Emergency Procedures
Attachments
Hospital Emergency Call List For Bulk Medical Gas Systems
U of I Hospitals and Clinics Medical Gas Site Layout
U of I Hospitals and Clinics Medical Gas Riser Plans
Attachments
Natural Gas: Main Valves, Locations and Areas Served
Attachments
Sewage Ejectors - Location and Areas Served
C-211           
Attachments
Medical Gas Alarm Test Procedure - Boyd Tower and South Wing
Medical Gas Alarm Test Procedure - General Hospital
Medical Gas Alarm Test Procedure - Roy Carver Pavilion
Medical Gas Alarm Test Procedure - John Colloton Pavilion
Medical Gas Alarm Test Procedure - John Pappajohn Pavilion
Medical Gas Alarm Test Procedure - Pomerantz Family Practice
IV.      Heating,
Ventilation and Air Conditioning Systems
C-302 Failure or Scheduled Shutdown of GH Air Handling Unit Number 20 serving Invitro Fertilization
Attachments
Invitro Fertilization Personnel Call List
C-303 Failure or Scheduled Shutdown of RCP Air Handling Units 13 and 14 serving the Bone Marrow Transplant Units
C-304           Failure of 
C-305 Failure of Air Handling Unit Number 11 JCP and or Exhaust Fans
C-306 Failure of CSS Air Handling Units Number 16 and Number 23 JCP and or Exhaust Fans
C-307 Failure of Operating Room Suite Air Handling Units Number 18 through Number 22
C-308 Failure of P.E.T. Air Handling Unit Number 1 JPP and or Exhaust Fans
C-309 Failure of Nuclear Medicine Air Handling Units Number 3 and Number 6 JPP and or Exhaust Fans
C-310           Failure
of SICU/Perinatal Air Handling Units Number 12, 13, #14, #15, and  #16  JPP
C-311           Building
and Equipment Maintenance Management Procedure of 
C-312           Building
and Equipment Maintenance Management Procedure of M.R.I. Air Handling Unit
Number 11 JCP and or Exhaust Fans
C-313           Building
and Equipment Maintenance Management Procedure of Operating Rooms Air Handling
Units Number 18 through Number 22 and or Exhaust Fans
C-314           Building
and Equipment Maintenance Management Procedure of P.E.T. Air Handling Unit
Number 1 JPP and or Exhaust Fans
C-315           Building
and Equipment Maintenance Management Procedure of Nuclear Medicine Air Handling
Units Number 3 and Number 6 JPP and or Exhaust Fans
C-316           Building
and Equipment Maintenance Management Procedure of Exhaust Fans Central
Sterilizing Services
C-317           Building
and Equipment Maintenance Management Procedure of SICU/Perinatal Exhaust Fans JPP
C-322 Failure of P.E.T. Main Chilled Water Flow or Temperature
C-323           Failure
of Chilled Water Operating Rooms Backup Cooling Change Over
C-331 Failure of Chilled Water Telecommunications Backup Cooling Change Over
Attachments
Invitro Fertilization Personnel Call List
C-333           Access
to Ceiling Space RCP Seventh Floor Bone Marrow Transplant
C-334           Access
to 
C-335           Access
to the M.R.I. Area
C-336           Access
to CSS Area Basement of JCP
C-337           Access
to Operating Room Suite Area Fifth Floor JCP West
C-338           Access
to P.E.T. Area Basement of JPP
C-339           Access
to JPP (P.E.T.) Secured Room Areas
C-340           Access
to Nuclear Medicine Area Third 
C-341           Access
to SICU Area Fifth Floor JPP East
C-342           Failure
or Scheduled Shutdown of Pomerantz Air Handling Units
# 1 and # 6
C-343           Failure
or Scheduled Shutdown of Pomerantz Exhaust Fan # 1
C-344           Failure
or Scheduled Shutdown of Pomerantz Chilled Water Pump
C-345           Building
and Equipment Maintenance Management Procedure of Pomerantz
Exhaust Fan # 1
C-346 Failure of Chilled Water Telecommunications Backup Cooling Change Over (Pomerantz)
C-347           Access to Perinatal Areas – Sixth and
Seventh Floor JPP
C-348           Failure
of Pediatric Bone Marrow Air Handling Units #15 JCP
C-349           Access
to Ceiling Space JCP Third Floor Pediatric Bone Marrow Transplant
C-350           RCP
AHU-20 Isolation Suite Mode of Operation Instructions
           UIHC Airborne Precaution Room List
           UIHC Protective Environment Room List
V.        GROUNDS
D-001           Operating a Gas Powered Leaf Blower
D-002           Operating a Cushman Truckster
D-003           Operating a Gas Powered Hedge Trimmer
D-004           Operating a Kubota RTV
D-005           Operating a Skid Loader
D-006           Operating a Utility Tractor
D-007           Operating a Power Washer
D-008           Operating a Weed Trimmer
D-009           Operating a John Deere Riding Mower
D-010           Operating a Kubota Riding Mower
D-011           Operating a Gas Powered Pole Saw
D-012           Operating a Gas Powered Tiller